Time taken : 1 hr 26 mins 04 secs
Distance : 12.58 km
Avg Speed : 8.8 km/h, 6min 50sec per km.
Soo run to sengkang, i accompany him on the way back.
Treat by Soo.
Took the circle line for the first time. Bishan MRT station.
Bishan circle line platform.
As can be seen, only 5 stations are open currently.
Inside the train.
View of the tunnel.
The long elevator at Serangoon station.
No comments:
Post a Comment