Saturday, November 5, 2011

Bike on 4 Nov - sengkang west and punggol waterfront.

Time taken : 1:02:30
Distance : 24.00 km
Avg Speed : 23.0 km/h, 02:36 min/km.

Time taken : 1:16:54
Distance : 20.05 km
Avg Speed : 15.6 km/h, 03:50 min/km.

Damn, it was drizzling when i started my ride after more than 1 month of layoff.
Decide to do loops at sengkang west area instead of going back home.
In case the rain became heavier, i can just ride home.
Ended up doing 7 loops of sengkang west.

As it was still early, i decide to ride to the new punggol waterfront for some exploring.
The second set of timing is the ride to punggol waterfront.





From 2011 Nov HTC Desire pictures

From 2011 Nov HTC Desire pictures

From 2011 Nov HTC Desire pictures

From 2011 Nov HTC Desire pictures

From 2011 Nov HTC Desire pictures

From 2011 Nov HTC Desire pictures

No comments: